Small submersible sewage pump installation is generally divided into coupling installation and mobile installation of two installation methods. Coupled installation is through the coupler to a small submersible sewage pump connected with the pipeline, a small submersible sewage pump and outlet pipe from the convenience of the pump overhaul by lifting device can be lifted. Mobile installation refers to the pump outlet pipe directly connected to the surface through the hose, the submersible sewage pump on the bottom of the pool by gravity or hanging through the chain hanging on the lifting device. Because the mobile installation without the coupler and the bottom fixed, easy to move, overhaul with the pipeline can be lifted together. At the same time due to the reasons for the installation, it is difficult to bear a large moment, only applies to small submersible sewage pump. Therefore, the following describes the mobile installation procedure.
In general, each factory will be equipped with a small submersible pump installation instructions, the user before installation, you need to carefully read the submersible sewage pump installation instructions, the relevant installation personnel to carefully read the installation instructions, to understand the installation diagram of each Layer meaning, in order to ensure the correct installation of small submersible sewage pump. In the following, a specific installation drawing is taken as an example.
1) The lowest level
Power 11kw or more pumps can choose to install the motor cooling system to cool the pump, if not selected cooling system, is directly by the pump cooling medium. Two different cooling methods corresponding to the lowest level of different, direct cooling method requires a higher level than the cooling system with the way. In the installation conditions diagram provided by the manufacturer, use the solid triangle “▼” and the hollow triangle “▽” to distinguish, where “▼” means cooling system, “▽” means without cooling system.
2) plane openings and positioning
Submersible pump coupled installation, the plane of the hole to consider the minimum submersible pump installation size. When positioning is performed, the side of the mounting guide is the reference line. This is because the submersible sewage pump is in place by coupling with the coupling device to complete the guide rod, the guide rod position determined by the pool. Coupler base of the bolt positioning, also need to take the pool as the baseline. Finally, the most important dimensions in the drawings are: the location and size of the top planar opening, and the location and size of the embedded anchor bolts at the bottom (generally used for the post-pouring concrete design). The top of the guide rod fixed expansion bolts are usually used to complete the way.
Also note that the small submersible sewage pump though small, but also to install the relevant safety equipment, such as float switches, humidity sensors.
Above is the installation of small submersible sewage pump need to pay attention to the relevant matters, if you do not know can contact us, professional engineers will provide you with one-on-one service.
In general, each factory will be equipped with a small submersible pump installation instructions, the user before installation, you need to carefully read the submersible sewage pump installation instructions, the relevant installation personnel to carefully read the installation instructions, to understand the installation diagram of each Layer meaning, in order to ensure the correct installation of small submersible sewage pump. In the following, a specific installation drawing is taken as an example.
1) The lowest level
Power 11kw or more pumps can choose to install the motor cooling system to cool the pump, if not selected cooling system, is directly by the pump cooling medium. Two different cooling methods corresponding to the lowest level of different, direct cooling method requires a higher level than the cooling system with the way. In the installation conditions diagram provided by the manufacturer, use the solid triangle “▼” and the hollow triangle “▽” to distinguish, where “▼” means cooling system, “▽” means without cooling system.
2) plane openings and positioning
Submersible pump coupled installation, the plane of the hole to consider the minimum submersible pump installation size. When positioning is performed, the side of the mounting guide is the reference line. This is because the submersible sewage pump is in place by coupling with the coupling device to complete the guide rod, the guide rod position determined by the pool. Coupler base of the bolt positioning, also need to take the pool as the baseline. Finally, the most important dimensions in the drawings are: the location and size of the top planar opening, and the location and size of the embedded anchor bolts at the bottom (generally used for the post-pouring concrete design). The top of the guide rod fixed expansion bolts are usually used to complete the way.
Also note that the small submersible sewage pump though small, but also to install the relevant safety equipment, such as float switches, humidity sensors.
Above is the installation of small submersible sewage pump need to pay attention to the relevant matters, if you do not know can contact us, professional engineers will provide you with one-on-one service.